ECHA’s Offices and Conference Center
The European Chemicals Agency’s new headquarters are located on Telakkakatu street, in Helsinki’s Punavuori district. The project was completed at the end of 2019. When the old shipyard closed and was vacated, the new zoning plan was created for the whole area, dedicating it to residences, cultural spaces, shops and offices.
In 2013, the City of Helsinki and Skanska Talonrakennus Oy jointly organized an international architectural competition for the new zoning plan of old dockyards, and the winning entry by Lundgaard & Tranberg Arkitekter A/S from Denmark was the basis of the new Telakkaranta zoning plans.

Old Carpentry Workshop Becomes Part of the New Office Building
The new building has eight floors, plus a basement and an HVAC machine room in the attic. The adjacent conference center is connected to the main office building by a pedestrian catwalk running across Pursimiehenkatu street.
As the old shipyard’s carpentry workshop was given a protected status by the new zoning plans, it was preserved and integrated into the new office building.
This listed building was originally built to serve as the shipyard’s paint and carpentry workshop. The original structure was designed by Theodor Höijer and built in 1899 as a two-story building. Gray granite was used to build both foundation walls and plinths while the façades were clad in red brick. The wood-framed windows are made out of small panes and have segmented brick arches above them. In 1933, the woodwork shop was badly damaged in a fire. The third story was added onto the existing structure during the restorations.



The integration of the old carpentry workshop into the new building was achieved by leaving its three exterior walls exposed at the western side of the building, while its fourth wall opens onto the atrium. The new building’s asymmetrical mansard roof and the façade were merged and uniformly clad in custom designed perforated Corten steel to create a seamless exterior. The office spaces themselves all open onto the atrium with the skylight that lets the daylight flood in. In accordance with the zoning plan, the main entrance is on the Telakkakatu street side. The café and the client meeting rooms are located on the ground floor.
The building was designed in such a way that it can house one or multiple tenants. The office spaces are located on floors 2–8. The floor plan leaves room for changes to fit the different needs of possible future clients.




Listed Engineering Workshop Turned into a Conference Center
ECHA’s Conference Center is situated in the old engineering workshop protected by the zoning plan. The engineering hall is the most significant building in Telakkaranta in historical, architectural and townscape terms. The workshop was originally designed by Sune Maconi in 1915, and completed in 1916 on the east side of the dry dock. The building remained a functioning engineering workshop of the Telakkaranta Shipyard all the way into the 1980s.
The building houses meeting rooms and different sized halls, as well as a restaurant and lounge spaces that cater for various events. The original open structure of an industrial engineering hall with side galleries has been mainly preserved. The new halls, the “Black Box,” which is visually separate from the side galleries, have been placed on three floors within the open hall. The walls of the Black Box facing the lobby and corridor spaces have been clad in untreated black, cold rolled and perforated steel sheets. The side galleries are connected to each other by bridge walkways running across the open hall. In accordance with the zoning plan, the bridge cranes valuable to industrial archeology and the original structure of the building have been preserved. The elevator counterweight on the north façade, protected by the zoning plan, is also preserved.



European Chemicals Agency ECHA
Location: Telakkaranta, Helsinki
Size: 23,000 gross m²
Completed: 2019
Client: Skanska Talonrakennus Oy